Our most important implemented jobs:

  • Design of a pleasure yacht of 32 m for a private owner
  • Conceptual design of a conversion for a chemical tanker of 5000 DWT
  • Conceptual design for a new chemical tanker of 8000 DWT
  • Classification and workshop drawings of chemical tanker conversion to double skin
  • Workshop drawing of chemical tanker conversion to double skin
  • Project Management of a conversion for a double skin chemical tanker
  • Classification drawing for a catamaran for offshore cable laying
  • Stability Booklet and damage stability booklet for a general cargo vessel
  • Classification drawing for a General Cargo according to RINA Class Society Rules
  • Project management, conceptual design, classification drawing and workshop drawing for a conversion of a Russian Navy paint vessel to an offshore research vessel
  • Installation of navigation equipment for an offshore research vessel
  • Design and realization of automation control system for main propulsion and rudder
  • Modernization and adaptation of existing propulsion control systems for DP2 requirements
  • Design of a crane pedestal for a cargo vessel
  • Design of a floating restaurant (32 m)
  • Create the new P&A Manuals for chemical tankers according to revised Annex II to Marpol 73/78 and the amended IBC Code
  • Conversion of supply vessel to seismic vessel
  • Conversion of fishing vessel to rescue vessel
  • Design and installation of bow thruster on offshore vessel including complete control automation system
  • Installation of DP2 system for offshore vessel
  • Concept design for an accommodation vessel
  • Design and realization of conversion from a PSV to an OBC seismic DP2 vessel
  • Design and realization of automation control system for rectractible azimuth thruster frequency converter drived
  • Conversion from Rescue Vessel to Seismic Vessel
  • Conversion from Supply Vessel to Research Vessel
  • supervision of general cargo ship repairs – complete overhaul of machinery, since vessel’s engine room was partly flooded after grounding
  • supervision of bulk carrier’s repair after grounding




M/V GSO Marechal Rondon
conversion to research vessel

M/V Saturn I
full supervision during vessel stay at shipyard in Poland

M/V Taviland
full supervision during vessel stay at yard in Turkey

M/V Finder
Conversion to research vessel

M/V Vikland
Conversion from PSV to OBC seismic

M/V Vikland
Air Compressors installation

M/V Ramco Express
Conversion to Seismic Cable Laying

M/T West Stream
Upgrade from IMO III to IMO II chemical tanker (double hull conversion)